~misterio/IC

b228e6aaf78de539aa41c74fb0493a7683b07b2f — Gabriel Fontes 1 year, 8 months ago 989aa60
melhorar wording na fase 4 da metodologia
1 files changed, 4 insertions(+), 4 deletions(-)

M project/project.md
M project/project.md => project/project.md +4 -4
@@ 126,10 126,10 @@ determine if the system fits their workflows and has intuitive usage; extensive
penetration testing, to guarantee the system's (critical) security.

During the fourth (and last) phase, the final system will be evaluated with
criteria similar to the third phase, but in a potentially different
infrastructure and without suffering any further major changes. This will serve
the purpose of evaluating the ease of deployment and overall success of the
finished project.
criteria similar to the third phase, but with potentially different
infrastructure and user groups. No further major changes will happen. This step
will serve the purpose of evaluating ease of deployment, applicability, and
thus overall success of the finished project.

Desirable side-effects from the promoted GELOS student contributions include:
obtaining more exhaustive awareness of existing solutions; introducing less